B Body Mopar B Body Mopar forum

69 rr project starting floor replacement

kev86
12-28-2010, 02:08 PM
starting the project with the floor panels...

Donny
12-28-2010, 06:29 PM
Wow, how long did it take you to sand the floor down?

detmatt1
12-29-2010, 05:36 AM
Going with AMD 1 piece front?

kev86
12-29-2010, 07:03 AM
no sand blasting...only with a grinder its about 2days work :-)
no i have bought 2 3/4 panels...because the tunnel is in very good shape and i bought the rear footwell area to. the rear is in perfect condition so no need for doing anything there..
i'l be uploading some more pictures soon..

kev86
01-13-2011, 04:22 AM
here are some more pictures...

roadrunnerman
01-21-2011, 12:47 PM
not looking too bad. i will have to get myself in gear abd start doing that on my RR soon also.

Aaron
01-30-2011, 12:43 PM
Great work on the floors! I need to do the same on mine.

detmatt1
01-30-2011, 05:31 PM
Looking good, nice work.