casey henson
Well-Known Member
I have gotten a few projects completed over the last couple of months. This is an original 25k mile car but many thing didn't work on the car when i got it. It is really starting to take shape and make a nice driver. list of things done so far...
1. Lean burn delete,400/4 barrel,new carb and dist
2. replaced radiator
3. replaced master cylinder
4. replaced the thermostat housing
5. replaced steering wheel
6. replaced the ignition lock cylinder
7. removed the catalytic converter
8. replaced the battery with one the fits.had a group 27,new ground cable also.
9. replaced stereo, Pioneer head unit and new 6x9's in rear deck
10. rebuilt both window regulators
11. rebuilt the wiper arm linkage with new plastic bushings.
1. Lean burn delete,400/4 barrel,new carb and dist
2. replaced radiator
3. replaced master cylinder
4. replaced the thermostat housing
5. replaced steering wheel
6. replaced the ignition lock cylinder
7. removed the catalytic converter
8. replaced the battery with one the fits.had a group 27,new ground cable also.
9. replaced stereo, Pioneer head unit and new 6x9's in rear deck
10. rebuilt both window regulators
11. rebuilt the wiper arm linkage with new plastic bushings.