roadrunnerman
Well-Known Member
Is that one on the right even a magnum manifold? It looks different to me.
So I was thinking I believe I read that to have a standard the crank my be drilled and tapped. I was think some day I may wanna go that route I'm thinking while my crank is at the machine shop I should have this done. Would this affect my auto build now ? I would think it would be the time to do it while its out and there.
. I also got an update from the machine shop he called 2 days ago and said the 452 heads I brought him will require seat and guide work as they were trashed as he said they looked fine to me but what do I know he said it would be 360.00 for the work on both without springs or valves. I will have to decide what I want to do with those. The block he said is all cleaned up and looks good but he still has to check the bores to see what will be needed. The crank he said needs to be turned 10 thousandths which will cost $120.00 and will be an additional 80.00 I think to have it tapped for a manual tranny so he thinks I should look for a forged crank that is drilled and tapped already and just have it turned if it needs it. So there is.starting to be some progress hopefully more soon to come.









ok here is an update today is like Christmas got a few things in i needed I ended up finding a forged crank that was already refurbished and drilled for pilot bushing for $120.00 I'm not going 4 speed now but may want to in the future. then from summit i received my speed pro piston set the speed pro rings both 30 over as the block needed to be bored. I also received a new melling high volume oil pump, new windage tray, mopar performance electronic ignition kit, por 15 factory manifold gray paint for my hp manifolds and summit chassis shield satin finish paint for the new 8 3/4 rear end and any other parts i wanna spray. I will be doing some sandblasting and painting soon also will be dropping off internals to machine shop for checking and balancing. here are some pics View attachment 99141View attachment 99142View attachment 99143View attachment 99144View attachment 99145View attachment 99146View attachment 99147View attachment 99148View attachment 99149View attachment 99150




ok new batch of stuff came in from 440 source new valley pan and intake gaskets, intake bolts , new timing cover, billet timing pointer and the new steal damper for my new forged crank. there will be more to come my cam and valve train parts should be here next week then some of it will go to the machine shop for checking and balancing. hopefully soon after that we can assemble the engine and get it ready to drop in.
My machinist also notified me thats all thats left for him is a hone on the freshly bored block and to balance the rotating assembly so we are getting close to the engine assembly. hopefully I will have some new updates soon.