Rustymopar
Well-Known Member
- Local time
- 1:31 AM
- Joined
- Jul 30, 2012
- Messages
- 807
- Reaction score
- 167
- Location
- Stevensville, Maryland
I just don't see me finding the time to finish my 69 Superbee.
It's about 80% done. Drive train is in it. All glass is in. I need someone to
1)Install new engine wiring harness (new color correct by year one)
2)Install dash harness (Color correct from year one) and dash with restored gauge cluster (From Redline in CA)
3)install All duct work and steering column (Already restored)
4) Install new ignition system (All new)
5) Finish front brake lines (I have all of SS tubing)
6) Install all clutch linkage (pedals are in as well as the 4 speed trans) and
7) Fire the car up.
I have been too busy building my daughter house (who is paralyzed) and I'd like to get the car done ASAP. I'd pay a flat fee plus any parts needed. You must have expertise in B bodies with references. Prefer someone in MD but would consider DE, VA or PA.
Rusty - PM me...
It's about 80% done. Drive train is in it. All glass is in. I need someone to
1)Install new engine wiring harness (new color correct by year one)
2)Install dash harness (Color correct from year one) and dash with restored gauge cluster (From Redline in CA)
3)install All duct work and steering column (Already restored)
4) Install new ignition system (All new)
5) Finish front brake lines (I have all of SS tubing)
6) Install all clutch linkage (pedals are in as well as the 4 speed trans) and
7) Fire the car up.
I have been too busy building my daughter house (who is paralyzed) and I'd like to get the car done ASAP. I'd pay a flat fee plus any parts needed. You must have expertise in B bodies with references. Prefer someone in MD but would consider DE, VA or PA.
Rusty - PM me...