Model year changeover at factory

General Discussion

  1. wasco

    wasco Well-Known Member

    Messages:
    124
    Likes Received:
    65
    Joined:
    Jun 1, 2016
    Location:
    Spokane, WA
    Local Time:
    3:40 AM
    I’m just wondering: what day (generally) is the model year change at a car factory? I know they take a couple weeks for retooling and such, but what day was the last ‘68 built and the first ‘69? Would it be possible to get a ‘68 Charger with a July 1 build date, or is that during the switch to the ‘69?
     
  2. WesleyK

    WesleyK Well-Known Member

    Messages:
    171
    Likes Received:
    176
    Joined:
    Nov 3, 2012
    Location:
    Collins Ms
    Local Time:
    5:40 AM
    I was thinking September but I may be off.
     
  3. 69L48Z27

    69L48Z27 FBBO Gold Member FBBO Gold Member

    Messages:
    1,912
    Likes Received:
    1779
    Joined:
    Nov 19, 2015
    Location:
    York, Pa
    Local Time:
    6:40 AM
    The VIN would confirm the model year. I’m not sure from 68 to 69 but I don’t think July would be the new model year. On other brand the last two weeks of August were the change over.
     
  4. Kern Dog

    Kern Dog FBBO Gold Member FBBO Gold Member

    Messages:
    10,156
    Likes Received:
    19543
    Joined:
    Apr 13, 2012
    Location:
    Granite Bay CA
    Local Time:
    3:40 AM
    I thought from reading online, the end of July was traditionally the end of that model year production. August began new car change-over for the machinery with new car production deliveries expected in early to mid September.
     
    • Agree Agree x 2
    • tmaleck

      tmaleck FBBO Gold Member FBBO Gold Member

      Messages:
      238
      Likes Received:
      276
      Joined:
      Apr 1, 2017
      Location:
      Austin, TX
      Local Time:
      5:40 AM
      My 68 has a mid July build date
       
    • mmissile

      mmissile FBBO Gold Member FBBO Gold Member

      Messages:
      8,935
      Likes Received:
      12088
      Joined:
      Jan 11, 2014
      Location:
      Motown
      Local Time:
      6:40 AM
      I got layed-off in JULY and August. Different weeks/different years. Mostly July, if I recall correctly. I worked at Warren Stamping, and I know they needed our panels before building cars.
       
    • Hilljack68

      Hilljack68 Well-Known Member

      Messages:
      169
      Likes Received:
      187
      Joined:
      Aug 20, 2017
      Location:
      Ohio
      Local Time:
      6:40 AM
      Likewise for my 68....(7/10/68)
       
    • Jessejames

      Jessejames Well-Known Member

      Messages:
      45
      Likes Received:
      30
      Joined:
      Mar 9, 2013
      Location:
      Sm
      Local Time:
      5:40 AM
      Last summer i was at the local portillos here in Milwaukee with my charger. A guy walked over to me and asked about my car. We had a brief conversation and I told him how fascinated i was with that era (1964-1970) and wondered what it was like to go to dealerships and be one of the workers on the assembly lines. He went on to tell me he was a college student in '68 and '69 and worked the summers at the Hamtramck plant. He told me the model yr change over was the last two weeks of July. He had alot of cool stories! He did prep work before the paint process and also drove the finished product of the assembly lines. We actually exchanged numbers and talked for some time on the subject. His wife didn't look happy at how long i kept him there... Lol
      To answer your other question... I have a 70 charger with a July 10th build date.
       
      • Like Like x 3
      • Thanks! Thanks! x 3
      • Hey-O

        Hey-O FBBO Gold Member FBBO Gold Member

        Messages:
        1,306
        Likes Received:
        4086
        Joined:
        Nov 21, 2018
        Location:
        St Charles MO
        Local Time:
        5:40 AM
        True.
         
      • Demonic

        Demonic Well-Known Member

        Messages:
        359
        Likes Received:
        282
        Joined:
        Jun 5, 2017
        Location:
        Over the hills, far away
        Local Time:
        6:40 AM
        When the GM plant was still here in Baltimore, there was a multi-week shutdown in July every year. If you had to do repairs in the boiler plant, paint piping, etc, that was the only time for it. Most employees on the line took their vacations then.
         
      • zyzzyx

        zyzzyx FBBO Gold Member FBBO Gold Member

        Messages:
        825
        Likes Received:
        670
        Joined:
        Aug 5, 2011
        Location:
        Lisle, Illinois
        Local Time:
        5:40 AM
        I'd like to watch videos of the assembly line process. I have seen some on-line, but I'm sure there
        are more out there hiding!
         
      • Hilljack68

        Hilljack68 Well-Known Member

        Messages:
        169
        Likes Received:
        187
        Joined:
        Aug 20, 2017
        Location:
        Ohio
        Local Time:
        6:40 AM
        Thanks for the info about the end of July change-over. Man, I love this site!
         
      • chargervert

        chargervert Well-Known Member

        Messages:
        1,018
        Likes Received:
        1399
        Joined:
        Jul 31, 2008
        Location:
        Rhode Island
        Local Time:
        5:40 AM
        My 70 Charger R /T V code was built on July 10th of 1970.
         