Today I wrapped up the short block. Got the clearance set on the button, put the slinger on the crank, put the new seal into the new cover[ with some rtv love in the recess]. Rotated it so the pan side was up. Cleaned off the bottom of the block, put the pickup tube in with some Teflon sealant on the threads, put some RTV down on the block after I cleaned it again, did gasket/tray/gasket with more RTV on all layers, put some RTV on the pan, put it on, got all the bolts in and snugged up. I also brushed some oil onto the chain before the pan and cover went on, even though I soaked it in oil for a week but let it drip off prior to the timing procedure. Torrington bearing got some assembly lube worked into it before full install too. Put a pair of drain cocks into the block for easier down the road coolant drains. Put the brass tipped fuel pump rod in, put Teflon on the plug and cinched that up. Rotated it back over, installed the drive unit with some assembly lube down the hole/on the gear/on the cam, put assembly lube on the lobes, put assembly lube in the lifter bores, put the lifters in, poured the lifter bath oil onto them and the block. Got it covered and bagged back up until I get the rest of the goodies. Pretty happy now.
View attachment 2022602
View attachment 2022603
View attachment 2022604
View attachment 2022605
View attachment 2022606