I need to measure for a new driveshaft in my 65 Bel, 440, late model Torqueflite,8 3/4, 3600lb SS springs. The Car is not yet complete, however , I added up what was missing, and added that amount of weight throughout the car, got her on the ground, and settled it out. My pinion is sitting at 2 1/2 degrees up. My understanding, it ideally should be 3 to 4 degrees down. Is there enough single shim available to correct this? Should I leave it? Not planning on going to the track. Also, do not intend on cutting and re welding the purches. Should this Imperfection be that critical on the length of the driveshaft?
Thanks
Thunder
Thanks
Thunder