dvw
Well-Known Member
So being laid off I'm finishing up projects. This is a 4.10 with a spool for a friends 65 Belvedere. He's had my center section in it for years with a sure grip. Car runs 11.30s. I'll say right now, if you dont do at least a couple axles a year, the time and tools probably arent worth the trouble. Mark the caps for side to side. Knock it all apart. If you dont have a bearing puller you can cut thru the outer race. Knock the race and rollers off. Then you can slice into the inner race. Be careful not to get into the carrier. Then knock the race off with a chisel. Save the old pinion shim. Clean it all up and we'll get started. I built a fixture that mounts to my press to hold the carrier. A few homemade tools. The spanner is a piece of 3/4" stock with two
7/16" bolts. A couple pieces of pipe to drive the bearings on. Old races split with a cutoff wheel to drive the new races in. 3/4" aluminum to use a jaw protectors for the vice
Doug

Doug




















