I got pictures of the wood trim for the shelving at the top and liquidated a few boxes of trophy's from the basement...
Began installing the R-38 insulation in the ceiling of the other side of the garage...
In the one picture of the side of the truss you can see how high the insulation goes as...
No gas on my road at all or I would have had that brought in...
My hose bib on the house is 25 or so feet away so I didn't see a lot of sense in putting water in...
My contractor is milking me pretty good too right now...
I got the wood trim and the shelves finished...but didn't take any...
I had the new LG Minisplit units delivered yesterday...
Need to coordinate installation of line sets and wiring prior to closing in the balance of the insulation in the walls...
Continued framing the LH side bulkhead-shelf...
Installed almost all of the rough lumber...
Installed the balance...
I picked up more rough cut and finished the RH side of the truss's...
Went today and picked up 5/8" drywall and installed it on the bottom of the bulkhead...
I need a few finished 3/4" trim boards to finish the shelf and the face...
Did all I could do with what I had so I built the scaffold...
I started installing the rough cut lumber on the side of the flat bottom truss's...
There will be a drop bulkhead that creates a shelf in front of the rough cut wood...
I had some of the vertical board and batten siding left over from when the front of the garage was built...
Those short pieces were perfect to put in the area above the garage doors...
One and done as this is a finished product with no additional work needed...
Got a lot of the insulation in the walls completed...
All of the insulation on the sloped ceilings is complete and all of the metal panels are installed...
Finished up the last of the 16 lights tonight...
I'm thinking I may be using the lower or the higher lights instead of all of them at...
More insulation installed...
Some wiring installed for a wall mounted light/clock...
Blocking installed between studs...
R-max finished above garage door...
It's just a slow process when installing blocking...electrical and insulation all at the same time to make sure nothing gets missed...
I ordered the roofing metal on Monday and picked it up on Friday...
I need to get some of the metal ceiling up so that I can cut and relocate the garage door track bracing...
Then I can finish the insulation around the bracing
Installed one row of lights so it's not as dark to work in...
Unloaded my 65 Belvedere II out of the 20' box trailer and used it to run and pick up the insulation...
Stocked everything in the garage and then loaded the car back up and put it away...it lives in the box trailer seeing as how my garage isn't finished...
Stocking to the garage wasn't too bad...
Insulation was ordered and I'm going to pick it up tomorrow...
Had to empty out my 20' box trailer to be able to haul all of it in one load...
I put all of the wiring exactly in the center of the 2x6 walls so I can run insulation behind and in front of it...
R-38 Kraft paper 24" for the...