I ordered the roofing metal on Monday and picked it up on Friday...

I need to get some of the metal ceiling up so that I can cut and relocate the garage door track bracing...

Then I can finish the insulation around the bracing

Installed one row of lights so it's not as dark to work in...

There will be 3 more rows...

Roofing metal is 17' 3 1/2" long and is being installed upside down...

IMG_4390.JPG


IMG_4391.JPG


IMG_4392.JPG


IMG_4394.JPG
 
More insulation installed...

Some wiring installed for a wall mounted light/clock...

Blocking installed between studs...

R-max finished above garage door...

It's just a slow process when installing blocking...electrical and insulation all at the same time to make sure nothing gets missed...

IMG_4400.JPG


IMG_4401.JPG


IMG_4402.JPG


IMG_4399.JPG
 
Got a lot of the insulation in the walls completed...

All of the insulation on the sloped ceilings is complete and all of the metal panels are installed...

Finished up the last of the 16 lights tonight...

I'm thinking I may be using the lower or the higher lights instead of all of them at once...

I'm not going to complain about maybe too much light...

IMG_4405.JPG


IMG_4408.JPG


IMG_4410.JPG


IMG_4411.JPG


IMG_4406.JPG
 
Back
Top