Glenwood
Well-Known Member
- Local time
 - 7:56 AM
 
- Joined
 - Jun 19, 2015
 
- Messages
 - 2,925
 
- Reaction score
 - 2,849
 
- Location
 - Kawartha Lakes, Ontario
 
With both sides ready to go, I decided to coat them with epoxy after I cleaned off the zinc coating with a wirewheel and degreased.
Good time to blast the filler tunnel and epoxy as well. It had a lot of surface rust and took an hour to blast.
		
		
	
	
		
	 
Good day's work done!
	
		
			
		
		
	
				
			Good time to blast the filler tunnel and epoxy as well. It had a lot of surface rust and took an hour to blast.
Good day's work done!
				














