wasco
Well-Known Member
I’m just wondering: what day (generally) is the model year change at a car factory? I know they take a couple weeks for retooling and such, but what day was the last ‘68 built and the first ‘69? Would it be possible to get a ‘68 Charger with a July 1 build date, or is that during the switch to the ‘69?