70rr-brian
Well-Known Member
70 roadrunner....
If I run an 8 gauge wire from the alt (batt post) to the starter relay (batt post) with a 12 gauge 30 amp fusible link. Then another 8 gauge wire from the starter relay (batt post) to the positive battery terminal again with a 12 gauge 30 amp fusible link I should be good?
This large wire will render the existing ammeter loop useless since the electricity will take the path of least resistance?
Thanks
If I run an 8 gauge wire from the alt (batt post) to the starter relay (batt post) with a 12 gauge 30 amp fusible link. Then another 8 gauge wire from the starter relay (batt post) to the positive battery terminal again with a 12 gauge 30 amp fusible link I should be good?
This large wire will render the existing ammeter loop useless since the electricity will take the path of least resistance?
Thanks